Every project below was supplied by Phoenix Power Stone from our factory in Shandong, China. Each case study describes the stone products delivered, the challenges we solved, and the results for our client. No hypotheticals — these are real projects with real specifications.
Luxury Hotel Stone Supply — Dubai, UAE
Supplied 8,500 sq m of Crema Marfil marble, G654 and G682 granite for a five-star hotel. Lobby flooring, 380 bathroom vanities, pool deck, and a book-matched feature wall. 14 containers delivered on schedule.
Read Case StudyResidential Complex Stone Package — California, USA
Kitchen countertops, bathroom vanities, and outdoor paving for a 220-unit luxury development in Orange County. Absolute Black granite and White Macaubas quartzite. 22 containers, zero customs issues.
Read Case StudyPublic Park Regeneration — London, UK
3,500 sq m of G654, G633, and G684 granite paving plus 1,200 linear meters of kerbstones for a Victorian park regeneration. Full BS EN 1341/1342 compliance. Shortlisted for council award.
Read Case StudyMemorial Stone Supply — Moscow, Russia
500+ Shanxi Black granite headstones in Russian Orthodox design, plus 1,200 sq m of cemetery paving. Shipped via China-Europe rail freight. Survived first Moscow winter with zero frost damage.
Read Case StudyCommercial Building Stone Cladding — Berlin, Germany
4,200 sq m of granite facade cladding and 1,500 sq m of lobby flooring for a six-story office building. Full CE marking compliance. 5,800+ precision-cut panels installed with zero rejects.
Read Case StudyFour Seasons Hotel — Kuwait City, Kuwait
Luxury marble and onyx for a five-star hotel reception area. Canadian designer specified Italian landscape green marble and green onyx. Precision fabrication from our Shandong factory.
Read Case StudyWest Kowloon Railway Station — Hong Kong
Granite supply for one of Asia's busiest transport hubs. Durable, high-traffic stone for a landmark infrastructure project on the high-speed rail network.
Read Case StudySoftware Campus — Bangalore, India
Granite flooring and cladding for a modern technology campus. Thousands of square meters for high-traffic corporate environments across multiple buildings.
Read Case Study